Call (615) 209-7643 Get my free estimate

Brentwood, TN · Williamson County

Grading Brentwood lots where the slope sets the permit

Brentwood’s grading rules turn on one number most owners never think about: the grade of the lot.

Call (615) 209-7643 or send the estimate form

The 15 percent line

Brentwood’s grading rules are in Chapter 56 of the city code, rewritten by Ordinance 2024-09, and the city’s engineering department reviews and approves land disturbance plans. One detail decides many residential jobs. Building a single-family house or its driveway is exempt from the grading permit only when the lot’s grades are under 15 percent.

On a steeper lot, the plan goes to engineering, so walls, benches and erosion control are worked out on paper before any machine moves.

The other exemptions, and where they end

For a homeowner, the two exemptions that matter are the slope and the size of an addition. Count the roof and any new paving together when you measure an addition against the 800-square-foot line.

  • An addition that adds less than 800 square feet of impervious surface is exempt.
  • Every exemption ends once disturbance reaches one acre, or when the lot is part of a larger plan of development.
  • Sites over five acres post security with the city.
  • No more than 50 acres may be under active soil disturbance at one time.

Ground that drains to the Little Harpeth

The one-acre line matches Tennessee’s construction stormwater permit, which also starts at an acre, so a larger Brentwood job answers to the city and the state at once.

The Little Harpeth River runs through the city, including the 27-acre Deerwood Arboretum. Crockett Park covers more than 170 acres, and Concord Park 40 acres at Concord Road and Knox Valley Drive. A regrade that sends more water downhill ends up in that river system, so on sloped lots we treat drainage and silt control as part of the grade itself.

Brentwood incorporated in 1969 and grew from 35.4 to 40.8 square miles with a 2001 annexation; 37,060 people lived here in 2010. The Maryland Farms office complex stands on what was an American Saddle Horse farm, which is the whole arc of site preparation in one address.

Permit office

City of Brentwood Engineering

County

Williamson County

Talk it through

(615) 209-7643

Land work in Brentwood: free, no-obligation estimates.

Get my free estimate

Answers

Land work in Brentwood: questions

Do I need a grading permit in Brentwood, TN?

It depends on the slope and the size. A single-family house or driveway is exempt only on a lot with grades under 15 percent, and additions under 800 square feet of impervious surface are exempt. Reach one acre of disturbance, or build within a larger plan of development, and no exemption applies. City engineering reviews the plans.

Who approves land disturbance plans in Brentwood?

The City of Brentwood’s engineering department. It reviews and approves land disturbance plans under Chapter 56 of the city code, as rewritten by Ordinance 2024-09. Brentwood is its own city, so Williamson County’s permit doesn’t apply inside city limits. Sites over five acres also post security with the city.

Will I need a retaining wall to build on a steep Brentwood lot?

Not always, but a steep lot is where walls come up. Above a 15 percent grade, Brentwood removes the house-and-driveway exemption, so the grading plan goes to city engineering. That plan has to hold the cut and fill somehow: sloping it back, benching it or walling it. We look at the slope and the footprint and go through the options.

What makes grading a Brentwood lot cost more?

Steepness, mostly. A lot over 15 percent needs an engineered plan, and it may need retaining walls and heavier erosion control. Trees, rock, the amount of soil moved and haul-off add to it. We walk the lot and price it for free, with the permit question included.

Is there a limit on how much land can be cleared at once in Brentwood?

Yes. Brentwood’s ordinance caps active soil disturbance at 50 acres at one time, and a site larger than five acres has to post security with the city. Those rules matter more to a developer phasing a subdivision than to a homeowner, but they shape how a large clearing job is sequenced.

Free estimate

Tell us about your land in Brentwood

Where your message goes and what we keep: privacy policy.

Free, no-obligation estimates

Tell us about the land

Where it is, what is on it now and what you want it ready for. We will look at it and give you a written estimate and a schedule before anything starts.

Call (615) 209-7643 Free estimate